Cloud Migration

We inventory every workload, build the target environment first, rehearse the cutover against production-scale data, and shut the old infrastructure down on a written schedule.

Timeline
10 to 20 weeks
Investment
Fixed-scope engagements from EUR 24,000
Delivered by
2 engineers, embedded with yours
Ends with
Documented handover

Move without a lost weekend and without a surprise invoice.

Migrations fail in two predictable ways. Either the cutover takes far longer than anyone planned and the business loses a weekend it cannot afford, or the migration succeeds and the first cloud invoice is double what the board approved.

We plan for both. Every workload is assessed and costed before anything moves, the target environment exists and is tested before the first byte of data is transferred, and the cutover is rehearsed end to end so the real one is boring.

This is for you if

  • You are running physical or co-located hardware that is approaching end of life.
  • Capacity planning happens months in advance and is usually wrong in one direction or the other.
  • A previous migration attempt stalled partway and left you paying for two environments.
  • You need a disaster recovery story that does not depend on one building staying dry.

Everything below is in the written scope before the engagement starts.

If something you need is missing from this list, it is a conversation during the proposal rather than a change request halfway through the build.

  • Migration assessment

    An inventory of every workload, dependency, data store and licence, with a per-workload recommendation to rehost, re-platform, rebuild or retire, and the reasoning behind each one.

  • Landing zone

    Accounts, network topology, identity, logging and guardrails built and tested before a single workload moves into them.

  • Data migration plan

    A replication and cutover strategy sized to the downtime your business can actually absorb, with the exact sequence of steps written out and timed.

  • Rehearsed cutover

    A full dry run against production-scale data, with the rollback path executed and timed, so the decision to proceed on the day is based on evidence.

  • Cost model

    A projected monthly bill per workload agreed before migration, then reconciled against the real invoice sixty days after cutover so any drift is caught early.

  • Decommissioning

    Old infrastructure retired on a written schedule with verified backups, so you stop paying for two environments as quickly as it is safe to.

A 10 to 20 weeks engagement, phase by phase.

A typical migration for a small or mid-sized company runs ten to twenty weeks, driven mostly by how many workloads move and how much data has to follow them. Nothing moves until the target environment has been built and tested.

  1. 01

    Assessment and costing

    Full inventory, dependency mapping and a costed target architecture. You get a migration plan with a per-wave schedule and a projected monthly bill before committing to the build.

  2. 02

    Landing zone build

    Accounts, networking, identity, backup and monitoring built as code, with the guardrails that stop the environment drifting once teams start using it.

  3. 03

    Pilot migration

    One low-risk workload moved end to end to prove the tooling, the runbook and the cost model against reality. The plan is corrected here, not later.

  4. 04

    Migration waves

    Remaining workloads moved in scheduled waves grouped by dependency, each with its own rehearsal, cutover window and rollback point.

  5. 05

    Cutover and decommission

    Final cutover, thirty days of parallel monitoring, then a staged shutdown of the old estate with backups verified before anything is deleted.

What changes for your team once this is in place.

These are the outcomes clients tell us mattered most six months after the engagement ended, rather than the ones that sound best in a proposal.

A cutover you can schedule confidently

Because it has already been run once against real data volumes, the window you announce to customers is a measurement rather than an estimate.

A bill you approved in advance

Costs are modelled per workload before migration and checked against the real invoice afterwards, so nobody discovers the number at the end of the month.

Capacity that follows demand

Seasonal or campaign-driven load stops requiring hardware decisions made months ahead of the traffic.

One environment, not two

A written decommissioning schedule means the old estate is genuinely switched off rather than quietly running for another year.

Three things people ask before committing.

If your question is not here, ask it on the introductory call. We would rather answer it before a proposal than after one.

How much downtime should we plan for?

That is an input to the design rather than an outcome of it. Tell us the window your business can absorb and we build the data strategy to fit it. Most of our clients land between fifteen minutes and four hours for the final cutover, and we confirm the real figure during the rehearsal before you announce anything to customers.

What if the cloud turns out to be more expensive than what we run today?

Sometimes it is, and we say so during the assessment rather than after the migration. The costed target architecture in week three is the point where you decide whether to proceed. Where the numbers do not work, we have recommended staying put, moving only part of the estate, or choosing a cheaper provider than the obvious one.

Can we migrate only part of our estate?

Yes, and it is often the right answer. Hybrid arrangements are common where hardware still has useful life left or where data residency rules make a workload awkward to move. We design the network and identity so both sides work as one environment rather than two disconnected ones.

Request a quote

Fixed-scope engagements from EUR 24,000. 10 to 20 weeks.

Ready to scope Cloud Migration?

Send us the shape of the problem and we will come back with a written scope, a timeline with dates, and a fixed price. The introductory call is free.